KOBO Utility Construction installed a complete high voltage utility system for six FAA navaid facilities at the Tampa International Airport. A concrete encased duct system was installed along with manholes, transformer pads, and other related concrete structures. FAA facilities were connected to the new URD system with out interference to air traffic. All work was self preformed and completed 30 days ahead of schedule.