IMG00128-20100226-1513-e1310743866670.jpg

Windsor Locks, CT

Parsons TSSC subcontracted KOBO Utility Construction to rebuild an FAA remote transmission receiver site. The work consisted of temporary relocation of twelve antenna’s while the facility was reconstructed. KOBO Utility Construction used their relationship with AGM Marine to rebuild the timber work of the RTR structure, KOBO Utility Construction then installed a new galvanized steel stairway, hand rails, and grating. Work was completed with no interruption to the facilities normal operation.